THE HONG KONG POLYTECHNIC UNIVERSITYSPEED
Dr CHAN, Hing-lun Joseph
陳慶麟
YIP, Sai-chung Leslie <br> 葉世中

Lecturer 講師

BSc, MSc, PhD [PolyU(H.K.)]; MHKIS; MRICS; MHKIPM
Email : hljchan@speed-polyu.edu.hk

Teaching and Scholarly Interests
  • Guaranteed Maximum Price (GMP) and Target Cost Contracting (TCC)
  • Construction Procurement Management
  • Relational and Collaborative Contracting
        
  • Property Management
  • Green Labelling Schemes in Construction Industry
  • Construction Project Management

Research-Scholarly Outputs
 

Professional Activities/ Achievements


BIOGRAPHY

Dr. Joseph Chan obtained his BSc (Hons) degree in Construction Economics and Management, MSc degree in Project Management and PhD degree in Construction Project Management from the Department of Building and Real Estate, The Hong Kong Polytechnic University. He started his surveying profession as a quantity surveyor in 2005 by joining a local leading quantity surveying consulting firm. He is a quantity surveyor by profession.

Dr Chan has worked in a number of tertiary institutions in Hong Kong. Dr Chan is also a Member of the Hong Kong Institute of Surveyors (MHKIS), Member of Royal Institution of Chartered Surveyors (MRICS) and Member of the Hong Kong Institute of Project Management (MHKIPM). He has produced over 20 publications in refereed journal papers, international refereed conference papers, consultancy reports, and other written outputs.


PROFESSIONAL SERVICES

1. External Referee for

  • Construction Management and Economics since 2009    
  • Journal of Construction in Developing Countries since 2009
  • International Journal of Project Management since 2010                      
  • Energy Policy since 2013
  • Facilities since 2013        

2. Assessor for Assessment of Professional Competence for Quantity Surveying Division of the Hong Kong Institute of Surveyors since 2014


LIST OF PUBLICATIONS (PUBLISHED / ACCEPTED JOURNAL PAPERS)

  1. Chan, D.W.M., Chan, A.P.C., Lam, P.T.I. and Chan, J.H.L. (2010). "Exploring the Key Risks and Risk Mitigation Measures for Guaranteed Maximum Price and Target Cost Contracts in Construction", Construction Law Journal, UK, 26(5), July, 364-378
  2. Chan, D.W.M., Chan, A.P.C., Lam, P.T.I., Yeung, J.F.Y. and Chan, J.H.L. (2011). "Risk Ranking and Analysis in Target Cost Contracts: Empirical Evidence from the Construction Industry", International Journal of Project Management, 29(6), 751-763.
  3. Chan, J.H.L., Chan, D.W.M., Chan, A.P.C., Lam, P.T.I. and Yeung, J.F.Y. (2011). "Developing a Fuzzy Risk Assessment Model for Guaranteed Maximum Price and Target Cost Contracts in Construction", Journal of Facilities Management, UK, 9(1), 34-51.
  4. Chan, J.H.L., Chan, D.W.M. and Lord, W.E. (2011). "Key Risk Factors and Risk Mitigation Measures for Target Cost Contracts in Construction - A Comparison between the West and the East", Construction Law Journal, UK, 27(6), September, 441-458.
  5. Chan, J.H.L., Chan, D.W.M., Lam, P.T.I. and Chan, A.P.C. (2011). "Preferred Risk Allocation in Target Cost Contracts in Construction", Facilities - Special Issue on Infrastructure Management, 29(13/14), October, 542-562.
  6. Chan, J.H.L., Chan, D.W.M., Chan, A.P.C. and Lam, P.T.I. (2011). "Risk Mitigation Strategies for Guaranteed Maximum Price and Target Cost Contracts in Construction - A Factor Analysis Approach", Journal of Facilities Management, 10(1), February, 6-25.
  7. Chan, D.W.M., Lam, P.T.I., Chan, J.H.L., Ma, Tony and Perkin, Thomas (2012). "A Comparative Study of the Benefits of Applying Target Cost Contracts between South Australia and Hong Kong" Project Management Journal, US, 43(2), April, 4-20.
  8. Chan, D.W.M. and Chan, J.H.L. (2012). "Developing a Performance Measurement Index (PMI) for Target Cost Contracts in Construction: A Delphi Study", Construction Law Journal, UK, 28(8), 590-611.
  9. Chan, J.H.L., Chan, D.W.M. and Clifford, Bryan (2014). "New Engineering Contracts (NECs) in Practice - Empirical Evidence from a Pilot Case Study in Hong Kong", Construction Law Journal, UK, 30(4), June, 217-235.
  10. Chan, D.W.M., Chan, J.H.L. and Ma, Tony (2014). "Developing a Fuzzy Risk Assessment Model for Guaranteed Maximum Price and Target Cost Contracts in South Australia" Facilities, UK, Volume 32, Issue 11/12, August, 624-646.
  11. Ng, T.S.T., Chan, J.H.L., Chan, G.K.C. and Zou, J. (2016) Environmental Impacts of Construction Materials Production, Proceedings of ICE - Engineering Sustainability, accepted in January 2016

 

LIST OF PUBLICATIONS (BOOK CHAPTER)

  1. Chan, J.H.L., Chan, D.W.M. and Lam, P.T.I. (2012). "Chapter 14 - Application of Target Cost Contracts and Guaranteed Maximum Price Contracts in the Construction Industry of Hong Kong" in Joint Ventures in Construction 2: Contract, Governance, Performance and Risk (Editors: Kiyoshi Kobayashi, Khairuddin Abdul Rashid, Masamitsu Onishi and Sharina Farihah Hasan), ICE Publishing Ltd: London, October, 185-200, ISBN 978-0-7277-5783-8 (hardback) (URL: http://www.icebookshop.com/bookshop_main.asp?ISBN=9780727757838).


INVITED PRESENTATION

  1. Invited presentation on the SOEHK (Society of Operation Engineers, Hong Kong Branch) Symposium 2012 Sustainability Development The Way towards Sustainable Future of Operations Engineering, 7 July, 2012Presentation Topic: An Introduction to NEC3 Contracts
  2. Invited presentation on BRE Research Seminar, 9 October 2013, Presentation Topic: Risk Ranking in Projects procured by Target Cost Contracts
     

SUCCESSFUL APPLICATIONS FOR RESEARCH  /  PROJECT FUNDINGS

  1. In capacity of Deputy Project Coordinator: Equipping Construction Professionals with Novel Project Delivery Concepts to Meet the Emerging Challenges of Construction Development in Hong Kong, Prof. Thomas Ng as Principal Project Coordinator, Professional Services Development Assistance Scheme, 2013-2014, HK$695,550
  2. In capacity of Deputy Project Leader: Book Writing Proposal Scheme for the Hong Kong Institute of Surveyors (HKIS) (2013) Book Title: Target Cost Contracting (TCC) Strategy in Construction: Principles, Practices and Case Studies, HKIS, HK$80,000
     

AWARDS

  1. Chan, D.W.M, Chan, A.P.C., Lam, P.T.I., Chan, J.H.L., Lord, Wayne and Ma, Tony (2015). "Evaluating the Key Risk Factors and Risk Sharing Mechanisms for Target Cost Contracting (TCC) Schemes in Construction" Research project selected as the Winner Award under the category of “Research" for the HKIPM Project Management Research Awards 2015 on 3 November 2015 by the Hong Kong Institute of Project Management (HKIPM)